Ground Clearance:0.5 Meters
Main Material:Q355/Q345B Tunnel Boom
Track Width:0.8 Meters
Showroom Location:Indonesia
Travel Speed:2.2 Km/h
Max Digging Height:4.3 Meters
Maximum Digging Depth:3.5 Meters
Maximum Height:4.5 Meters
Bucket Cylinder:Not Included
Ground Clearance:0.5 Meters
Bucket Cylinder:Not Included
Machinery Test Report:Not Available
Keywords:Excavator Tunnel boom
cylinder:larger cylinder
Main Material:Q333B excavator tunnel boom
Part Name:Long Reach Boom
Main Material:Q355/Q345B Tunnel Boom
Cylinder:Not For Planing
Keywords:Mining Excavator Sliding Arm, Earth-moving Excavator Sliding Arm, Digger Sliding Arm Excavator
Operator-Friendly Design:Intuitive Controls And Ergonomic Features Facilitate Easy Operation, Reducing Operator Fatigue And Enhancing Safety.
Product Category:Excavator Tunnel Boom
Excavator:Hitachi ZX300
Color:Black, Yellow, Orange, Ect
Adaptability:Suitable for various working scenarios and excavation requirements
Condition:Never Used, Total New
Main Material:Q355B excavator tunnel boom
Keywords:Tunnel boom arm
Condition:Never Used, Total New
Color:as you request
Main Material:Q355B excavator tunnel boom
Condition:Never Used, Total New
Main Material:Q355B excavator tunnel boom
Keywords:Tunnel boom arm
Condition:Never Used, Total New
Main Material:Q355B excavator tunnel boom
Keywords:Tunnel boom arm